Skip links

Power Station Project, Northern Ireland, UK

Trans Global Projects managed the delivery of oversized and heavy cargo for a power generation project in Northern Ireland, coordinating DDP shipments from multiple origins across Europe and North America via the Port of Belfast – including four heavy lifts of up to 400 mt each and four dedicated vessel charters.

FACTS & FIGURES

Client​
A major OEM in the power and energy sector

Location​
EU and North American origins to Belfast, Northern Ireland, UK

Project Period​
2022

Total Cargo Weight / Volume​
17,000 cbm

SCOPE OF WORK

TGP delivered generators and gas turbines from various origins in Europe and North America via Belfast, Northern Ireland to a power plant in Antrim, Northern Ireland – with door-to-door responsibility. The project consisted of 4 heavy lifts up to 400 mt each and 4 vessel charters within a period of 6 months. The transport included several bridge assessments and modifications.

It was the first time a convoy execution has been carried out in Northern Ireland. The generators were the heaviest items ever transported overland in Northern Ireland, which required considerable advance planning, liaison with local authorities and route planning by TGP’s experienced team over the course of several months.

Download Case Study (PDF)

Download

More Case Studies

All case studies
This site is registered on portal.liquid-themes.com as a development site. Switch to production mode to remove this warning.