Multiple Power Transformer Delivery Programme, USA
Trans Global Projects managed the door-to-door transport of 47 electrical transformers from Brazil to the USA, overseeing engineering calculations, barge loadouts and full project coordination across multiple phases of ocean and inland transport.
FACTS & FIGURES
Client
An international power equipment manufacturer
Location
Brazil to USA
Project Period
2024 – 2025
Total Cargo Weight / Volume
6,195 mt / 10,048 cbm
SCOPE OF WORK
TGP transported multiple transformers of varying weights from Brazil to the USA, delivering 11 units in 2024 and a further 36 units in 2025.
The transformers ranged from 58 to 206 mt each. TGP managed the full door‑to‑door scope, including engineering calculations, loadout onto barges, transport, and overall project management.




