Skip links

Hydrogen Plant Project, The Netherlands

Trans Global Projects delivered a global logistics programme for a hydrogen liquefaction facility, moving heavy-lift and out-of-gauge equipment from multiple origins to Rotterdam, the Netherlands for laydown and onward transport to site, ensuring seamless coordination across complex supply chains.

FACTS & FIGURES

Client
A major industrial gases producer

Location
Worldwide origins to Rotterdam, The Netherlands​

Project Period​
2025 – 2026 (ongoing)​

Total Cargo Weight / Volume​
89,000 cbm​

SCOPE OF WORK

TGP provided project logistics for in- and out-of-gauge (OOG) equipment, skids and modules for consolidation, shipping and delivery from global locations to a marshalling yards in Rotterdam, the Netherlands for temporary laydown and final delivery to site. The total volume shipped for the project was 89,000 cbm, including 77 heavy lift and OOG moves.

The project is a groundbreaking initiative aimed at expanding hydrogen production capacity in Europe. The largest structure moved was a CO2 absorber measuring 65.40 x 5.80 x 5.80 m and weighing 390 mt.

Download Case Study (PDF)

Download

More Case Studies

All case studies
This site is registered on portal.liquid-themes.com as a development site. Switch to production mode to remove this warning.