Hydrogen Plant Project,
Saudi Arabia
Trans Global Projects managed multiple breakbulk shipments from South Korea and Thailand to Saudi Arabia, supporting the delivery of heavy and oversized cargo to the Eastern Province. The scope included the transport of a 92 mt steam drum from Masan, South Korea, alongside additional breakbulk volumes from Laem Chabang, Thailand, covering import customs clearance, marine warranty surveys, interim storage, on‑carriage to site and offloading activities.
FACTS & FIGURES
Client
A major industrial gases producer
Location
Masan, Korea and Laem Chabang, Thailand to Dammam, Saudi Arabia
Project Period
2021
Total Cargo Weight / Volume
6,500 cbm
SCOPE OF WORK
TGP undertook multiple breakbulk shipments, including the shipment of one 92 mt Steam Drum ex-Masan, South Korea and the shipment of 6,270 cbm from Laem Chabang, Thailand to the Eastern Province of Saudi Arabia. The scope of work included import customs clearance, marine warranty surveys, storage at the industrial site, on-carriage to site location and offloading activities.
This steam methane reformer (SMR) hydrogen production plant matched the largest ever built in the company’s history. TGP delivered on time, on budget and with zero damage or lost time injuries.



