OCTG Shipment, Abu Dhabi, UAE
TGP managed the first phase of a pipe supply programme, moving approximately 27,000 metric tonnes of oil country tubular goods (OCTG) from China to the United Arab Emirates over several voyages. The scope included detailed transport, lifting and stowage planning to ensure safe and reliable execution. In 2025, TGP also carried out re‑supply shipments for the project.
FACTS & FIGURES
Client
An international pipe manufacturer
Location
Zhangjiagang and Shanghai, China to Abu Dhabi, UAE
Project Period
2024 and 2025
Total Cargo Weight / Volume
27,000 mt
SCOPE OF WORK
TGP managed the first phase of a pipe supply programme, transporting approximately 27,000 metric tonnes of oil country tubular goods from Zhangjiagang and Shanghai in China to Abu Dhabi in the United Arab Emirates. Shipments moved over several voyages.
TGP developed the full transport concept, including transportation, lifting and stowage plans to support safe and efficient handling across all stages of the move. In 2025, TGP also carried out re‑supply shipments for the project.
All cargo arrived on schedule, with a 100 per cent on-time delivery record and a damage rate of just 0.06 per cent.




