Hydrogen Plant Project, The Netherlands
Trans Global Projects delivered a global logistics programme for a hydrogen liquefaction facility, moving heavy-lift and out-of-gauge equipment from multiple origins to Rotterdam, the Netherlands for laydown and onward transport to site, ensuring seamless coordination across complex supply chains.
FACTS & FIGURES
Client
A major industrial gases producer
Location
Worldwide origins to Rotterdam, The Netherlands
Project Period
2025 – 2026 (ongoing)
Total Cargo Weight / Volume
89,000 cbm
SCOPE OF WORK
TGP provided project logistics for in- and out-of-gauge (OOG) equipment, skids and modules for consolidation, shipping and delivery from global locations to a marshalling yards in Rotterdam, the Netherlands for temporary laydown and final delivery to site. The total volume shipped for the project was 89,000 cbm, including 77 heavy lift and OOG moves.
The project is a groundbreaking initiative aimed at expanding hydrogen production capacity in Europe. The largest structure moved was a CO2 absorber measuring 65.40 x 5.80 x 5.80 m and weighing 390 mt.



